Close

Diversion of Flood Surplus water from Mettur Dam

Diversion of Flood Surplus water from Mettur Dam
Title Description Start Date End Date File
Diversion of Flood Surplus water from Mettur Dam

Diversion of Flood Surplus water from the Mettur Dam to the dry tanks in the Sarabanga Basin in Salem district by lift irigation

 

12/11/2019 02/02/2022 View (2 MB) AS Revised (2 MB) 19(1) Declaration Gazette (2 MB) MPS Tamil map (702 KB) Timeextention2021 (1 MB)